ST. LOUIS COUNTY POLICE PRECINCT #2 & INTELLIGENCE CENTER

Updated: 05.20.2025

Site perimeter curbs are being installed.  Masonry is about 65% completed to date.  Sheet metal flashings and siding are currently being installed.  Glazing started last week on 5.15.  Interior MEP rough in is taking place, and we hope to have lower level interior framing inspection soon for drywall work to ramp up.

Broke Ground: 06.05.2024

Predicted Completion: Summer 2026

Latest photos of the site are below.